74 changes: 74 additions & 0 deletions CHANGELOG.md
Original file line number Diff line number Diff line change
Expand Up @@ -12,6 +12,80 @@ A stray bridge tag `temp-deploy-bridge-2026-05-11` (unrelated to any CHANGELOG e

---

## v2.9.44 — 2026-09-15 — cross-calendar finish instants: successors driven from the predecessor's finish instant on their own calendar; backward pass mirrored

**Engine math changed.** The forward and backward passes both move on any
network whose relationships cross calendars, so a deliverable already issued
from a tagged build is inside the supersession window and needs the re-check
step in PROCEDURE.md.

What P6 does: an early finish is an INSTANT, the close of the last working
period of the activity's own calendar (Friday 17:00 on Mon-Fri). A successor
starts at the first working instant of ITS OWN calendar at or after that
instant plus lag, the lag consumed as working time on the relationship-lag
calendar from the instant.

What the engine did: it carried a finish as the opening of the next working
day on the FINISHING activity's calendar (Monday for a Friday finish), handed
that boundary to the successor as-is, walked the lag on the lag calendar from
it, and never snapped the result onto the successor's calendar. Measured on a
2,898-activity real export with five active calendars (a Mon-Fri design
calendar, a 680-exception blackout calendar, an installation calendar, a
seven-day calendar and the project calendar), once the 40 activities whose
stored dates the file's own logic cannot produce were pinned, every one of
the 25 residual root divergences from P6's stored early dates was one of:

- a successor starting on a day its own calendar does not work (a
blackout-calendar successor inside its blackout, engine 2027-08-05 against
P6 2027-09-15, early finish equal because the duration walk skipped the
blackout anyway; a Mon-Fri successor of a seven-day predecessor on a Sunday);
- a seven-day successor of a Friday finish starting Monday, two days after
P6's Saturday (20 of the export's 109 seven-day activities);
- a successor whose calendar works the predecessor calendar's holiday
starting the day after it (Victoria Day and New Year's Day between the
design and installation calendars);
- a completed predecessor's successors starting on its finish day.

Changes, paired in `cpm-engine.js` and the Python reference:

- `ef_instant` / `ef_instant_date` on every node: the calendar day whose
opening the finish is (Saturday for a Friday 17:00 finish). `ef` /
`ef_date` stay the boundary on the activity's own calendar.
- FS / SS / FF / SF drives are computed as instants (`_lagFromInstant`) and
snapped onto the successor's calendar (`_snapFwd`); FF / SF anchors likewise.
- A positive lag is working time on the lag calendar counted FROM the
instant (Thursday 17:00 + one Mon-Fri day is Friday 17:00; Friday 17:00 +
one is Monday 17:00); a negative lag retreats from it.
- A finish milestone (`task_type` TT_FinMile) sits at the instant that drove
it; a start milestone at its own calendar's next working start; a
zero-duration node without a task type keeps the snapped instant.
- A completed predecessor's instant comes from the TIME of its actual finish
('2027-03-05 17:00' is the close of Friday); a date-only value keeps the
legacy reading. The node keeps the date part for display.
- The data date is an instant too: 'YYYY-MM-DD 17:00' floors remaining work
on the next day.
- The backward pass mirrors it (`_lagBackFromInstant`, `_snapBwd`,
`_lfInstantOf`): a successor's late start is the instant the predecessor
must finish before, and the bound is expressed on the predecessor's own
calendar. Without this mirror the new forward instants manufactured
negative float on cross-calendar links (a Mon-Fri predecessor of a
seven-day successor was handed a Saturday late finish against its Monday
early-finish boundary, tf -2, no constraint anywhere); with it, forward
and backward walks are inverses again and the V2942-7 fixture that used
to manufacture tf -1 now reports the two seven-day days of float P6 does.

Same-calendar networks are byte-identical to v2.9.43 (every crossval fixture
except the mixed-calendar F11 was unchanged; F11 now agrees between the
engines on the instant reading). Tests: XC-1..XC-10 in `cpm-engine.test.js`
(1,288 checks green), `test_cross_calendar_finish_instants_2026_09_15.py` on
the Python side (21 pins); the in-suite smoke crossvals 153/153 and 86/86; the
public harness 46 fixtures, 1009 of 1015 comparisons executed and bit-identical
(the 6 mutual skips unchanged); coverage re-measured on these bytes 2026-09-15:
93.79% statements, 83.32% branches, 94.69% functions. Three existing
expectations that pinned the boundary walker's under-count were updated with
their derivation (V2942-7 successor-walk date and negative-float checks, RL-7
Saturday start of a Mon-Fri activity).

## v2.9.43 — 2026-09-02 — retained-logic P6 semantics: SS/SF drive from restart; restart snapped, always defined, not floored by a future actual start; corrupt-calendar P6 fallback (two-conjunct predicate)

**Engine math changed.** The retained-logic forward pass, free-float slack
Expand Down
4 changes: 2 additions & 2 deletions CONTRIBUTING.md
Original file line number Diff line number Diff line change
Expand Up @@ -6,7 +6,7 @@ Thank you for considering a contribution. The engine is the core of an active fo

## Quick rules

1. **Every commit must pass 1,273 unit tests, 0 fail.**
1. **Every commit must pass 1,288 unit tests, 0 fail.**

```bash
npm test
Expand Down Expand Up @@ -96,7 +96,7 @@ Every output manifest reads `ENGINE_VERSION` and embeds it in the report. A vers

## Pull-request checklist

- [ ] `npm test` passes (1,273 tests, 0 fail).
- [ ] `npm test` passes (1,288 tests, 0 fail).
- [ ] `npm run crossval` passes (1009 of 1015 defined comparisons executed and bit-identical, 0 failures, across 46 fixtures; 6 skipped rather than compared).
- [ ] If you added a new citation, the URL is in `docs/citations.md` and the case/RP is real.
- [ ] If you bumped the engine version, both `cpm-engine.js` and `package.json` are updated.
Expand Down
Loading
Loading